Our Plant, Fleet and Offices

Plant
Our extensive plant fleet is one of the largest in the industry. It enables us to tackle projects of any scale with unmatched efficiency. We take pride in maintaining our equipment to the highest standards, with regular servicing and rigorous checks to ensure optimal performance and reliability. This commitment allows us to minimise downtime, enhance productivity, and consistently deliver outstanding results on every project.
Plant Fleet Renewals
With a fleet of over 600 Excavators, we are now the UK’s largest buyer of Hitachi construction equipment. Our industry-leading replacement cycle of 2.5 years means that our entire fleet of machines always meet Stage V emissions regulations.
Our Machines
Excavators
growing to 727 before the end of the year
Dumpers
growing to 521 by end of the year
Rollers
growing to 243 by end of the year
Telehandler
growing to 53 by end of year
GPS Machine Control Units
growing to 64 by end of the year
Vans
growing to 900 by end of the year
Fleet and Offices
Since founding, our office portfolio has continued to expand across the country. We also take pride in maintaining one of the nation’s largest and most modern eco-friendly fleets.

Commercial Vehicles
We operate a strong fleet of Ford commercial vehicles, with a maximum replacement cycle of 2.5 years ensuring our entire fleet is Euro 6.2 compliant. We use the very latest Ford Pro technology to manage maintenance, and all vehicles are fitted with Matrix Telematics including onboard cameras to ensure that they are always driven safely.
Offices
We have invested in the long-term sustainability of our regional locations by purchasing premium office spaces. Our building in Solihull provides a fantastic base for our Group. We currently have 7 regional offices supporting our 250+ operational sites from Reading to Blackpool, our latest addition being Warrington.
Offices
We have invested in the long-term sustainability of our regional locations by purchasing premium office spaces. Our building in Solihull provides a fantastic base for our Group. We currently have 8 regional offices supporting our 250+ operational sites from Reading to Blackpool, our latest addition being Warrington.
Safety Shield
Safety Shield is an advanced AI human form recognition safety system developed to protect pedestrians and site personnel, warn the plant operator of people entering the red zone, and provide data footage for further training and development. All of our large plant is equipped with Safety Shield as standard.
GPS
Our investment in GPS has given us huge benefits. Machine control allows us to ‘virtually’ set out and work to our site datum without the requirement for traditional engineering methods, giving us greater accuracy and production efficiencies. We minimise the need for people to work in close proximity to the machinery therefore enhacing safety. With over 60 excavators fitted with the base install, we have the flexibility of moving the kits around.
Kerb Race
Kerb laying previously required three times the manpower and significantly more time to complete. Since purchasing our first Arrow Machine in 2020 we have seen huge efficiency improvements. The machine works on an extrusion method which compacts the concrete placed into the top and uses the it to propel itself forward. It also provides consistency in size and height.